Konya Meram Çukurçimen Pond Irrigation Construction; (Construction work)
The State Water Supply Administration 4th Regional Directorate / Konya
Work completion: 11.07.2013
505.804,16.-USD
Konya Kulu İlçe Merkezi 2nd Section Flood Protection Construction;(Construction work)
The State Water Supply Administration 4th Regional Directorate / Konya
Under construction at present
774.250,00.-USD
         
Yozgat Sorgun Araplı Pond Irrigation Construction; (Construction work)
The State Water Supply Administration 12th Regional Directorate / Kayseri
Under construction at present
907.748,50.-USD
Bayburt Merkez Konursu Pond Irrigation Construction: (Construction work)
The State Water Supply Administration 22nd Regional Directorate / Trabzon
Under construction at present
1.240.000,00.-USD
         
DOGAN 01 APARTMENT BLOCK; (Construction work)
GOP, Ankara / Turkey, 10.11.1980
The building is totally 4 storied and 1,265m2. Totally contains; n.8 apartments.

DOGAN 03 APARTMENT BLOCK; (Construction work)
Cicekli-Kecioren, Ankara / Turkey, 13.02.1986
The building is totally 6 storied and 1,740m2. Totally contains; n.18 apartments and n.1 shop.

         
DOGAN 02 APARTMENT BLOCK; (Construction work)
GOP, Ankara / Turkey, 08.06.1982
The building is totally 4 storied and 1,290m2. Totally contains; n.6 apartments and n.2 shops.
 
DOGAN 04 APARTMENT BLOCK; (Construction work)
19 Mayis-Kecioren, Ankara / Turkey, 02.10.1986
The building is totally 5 storied and 2,427m2. Totally contains; n.21 apartments.
         
Gazi Mahallesi Market Place Construction; (Construction work)
Gazi Mahallesi, Yenimahalle,
Ankara / Turkey, 08.03.1988
Contract price; 210,193.-USD
(2007 unit price)
 
DOGAN 05 APARTMENT BLOCK; (Construction work)
Tasocagi-Etimesgut, Ankara / Turkey, 06.09.1993
The building is totally 6 storied and 2,273m2. Totally contains; n.16 apartments and n.2 shops.
         

DOGAN 06 APARTMENT BLOCK; (Construction work) Cankaya,
Ankara / Turkey , 13.12.1995The building is totally 7 storied and 1,805m2. Totally contains; n.10 apartments and n.4 warehouse.

 

DOGAN 02 OFFICE BLOCK; (Construction work)
Sincan, Ankara / Turkiye, 25.11.1999
The building is totally 3 storied and 2,511m2. Totally contains; n.28 industrial type shops.

         

Turk Idareciler Dernegi Genel Merkezi Cafe and Patisserie
design and construction work;
(Turnkey work)Kizilay, Ankara / Turkey, 25.01.2002Contract price; 152,605.-USD (2007 unit price)

 

SYENERJI Ofis design and construction work; (Turnkey work)
Balgat, Ankara / Turkey, 03.04.2003
Contract price; 62,712.-USD
(2007 unit price)

         

LEYLAA Bar decoration, design and counseling work
(Design and counseling work)
Dikmen, Ankara / Turkey, 28.06.2002

 

DOGAN 07 APARTMENT BLOCK; (Construction work - under construction at present) Cankaya, Ankara / Turkey, 01.10.2007 The building is totally 8 storied and 2,392m2. Totally contains; n.11 apartments and n.2 warehouse.

         

US Military, Providing & producing Jersey barrier and Texas barrier; (Construction work)
Fallujah, Baghdad / Iraq, 04.07.2007
Contract price; 825,000.-USD
(2007 unit price)

US Military, Providing & producing Jersey barrier and Texas barrier; (Construction work) Fallujah, Baghdad / Iraq, 08.09.2007 Contract price; 13,200.-USD (2007 unit price)

   
         
     
         
OTHER WORK COMPLETIONS


ELLBSE Store, Balgat, Ankara , Turkey
(Decoration, design and construction work)


AKER Insaat Co , excavation works, 1988, Turkey
contract price 63,104.-USD (2007 unit price)


Karayollari 4. Bolge , excavation, filling and channel works, 1979, Turkey contract price 938,244.-USD (2007 unit price)


DILEK Insaat Co, excavation and road works, 1978, Turkey
contract price 2,316,278.-USD (2007 unit price)


Karayollari 4. Bolge , excavation and road works, 1978, Turkey
contract price 761,760.-USD (2007 unit price)

     